Sightadel

Platform · Action plans

Every gap becomes a task.
With a name and a date.

An assessment shows where something is missing. For it to be fixed, it needs a responsible person and a deadline. In Sightadel you create action plans for this and link them to exactly the controls, documents or vulnerabilities they concern.

Clear ownership

Every action plan has exactly one responsible person. Who is in charge is shown in the list.

Context, not silos

Plans are linked to the controls, documents and vulnerabilities they concern. The connection is never lost.

Deadlines in view

Due date and status show what comes next.

Fully logged

Creating, changing and completing a plan is recorded in the activity log, with time and person.

How it works

Set up in 4 steps.

  1. 1

    Create a plan

    You give it a title, for example “Management review”, and describe what needs to be done if required.

  2. 2

    Set owner and deadline

    You choose the responsible person and optionally set a due date.

  3. 3

    Link objects

    You link the plan to vulnerabilities, documents, requests or controls. You select controls directly from the framework.

  4. 4

    Work on it and complete it

    The status shows progress. Once the measure is in place, you complete the plan.

Before and after

What changes with action plans.

The work does not disappear – the searching, asking around and chasing people does.

Without Sightadel

  • Open items are scattered across minutes, emails and personal lists.
  • Audit findings are noted but not assigned to anyone.
  • Only the person who worked on a gap knows whether it has been fixed.
  • The link between a measure and a control has to be explained verbally in the audit.
  • There is no proof of who changed what and when.

With Sightadel

  • Every action plan has a responsible person and, if you wish, a deadline.
  • Plans are linked to controls, documents, vulnerabilities and requests.
  • The status shows what is open, in progress or completed.
  • An issue in the Security Score becomes an action plan.
  • The activity log records every change with time and person.

Action plans

What can be linked

An action plan rarely stands alone. Through the links you see in the plan what it refers to, and in the control or evidence which plans belong to it.

  • Vulnerabilities from the scan of your domains
  • Documents from the evidence archive
  • Requests
  • Controls from your active frameworks

Action plans

Activity log

The activity log records who did what and when, across the entire platform. It shows, for example, when an action plan was created, changed or completed and when control data was submitted.

  • Date and time of every action
  • Type of action and affected object
  • Performed by, with role
  • Details of the change
  • Filters by action, resource type and period

Action plans

Why this counts in the audit

The auditor wants to see that identified gaps are not just noted but fixed. A plan with an owner, a deadline and a history is exactly that proof, for example for corrective action under clause 10 of ISO 27001.

  • Evidence of corrective action
  • Traceable history
  • Link to the affected control
  • Overview for oversight by management, for example under NIS2
  • Basis for the management review
  • Proof of effectiveness through linked evidence

In detail

Action plans: what you should know.

From finding to action plan

Gaps arise in many places: in the assessment, when a control is answered with “none”, in the internal audit, in the management review, through a finding in the Security Score or through a customer request. What matters is that each of these gaps ends up in one place and is no longer lost there.

An action plan does not need much. A title and a responsible person are mandatory. Phrase the title so that it makes sense without context, for example “Introduce multi-factor authentication for remote access” rather than “MFA”. In the description, record exactly what needs to be done and how you can tell it is done.

Then link the plan to everything that belongs to it: the control from the framework, the affected document, the vulnerability or the request. You select controls directly from the active framework. That way, anyone who opens the control can see that the gap is being worked on.

Set a deadline, even though it is optional. Experience shows that a plan without a date gets left behind. Choose the deadline realistically and according to risk: a critical vulnerability takes priority over the wording of a policy.

Good practice for ownership and deadlines

Every plan has exactly one responsible person. This is deliberate. Several owners lead to nobody feeling responsible. The responsible person does not have to carry out the measure alone, but they make sure it gets done and report on progress.

Split large undertakings into several plans. “Introduce an ISMS” is not an action plan but a project. “Review access rights for the accounting system” is one. Small, clearly defined plans can be tracked and completed. That shows progress and keeps everyone involved on track.

Go through the open plans regularly, for example in a monthly meeting with the owners. Ask not only about status but about obstacles. If a deadline slips, adjust it and record the reason in the description. A traceably postponed date is not a problem in the audit; one that is silently missed is.

Only complete a plan once the measure is effective, and link the proof of this as evidence.

What auditors check for corrective action

Management system standards such as ISO 27001 and ISO 9001 require you to react to nonconformities, determine the cause, take action and evaluate its effectiveness. The auditor checks this cycle using examples.

They pick a finding from the last external or internal audit and ask what became of it. Good answers show a plan with a responsible person, a deadline, a history and proof of implementation. Weak answers consist of the sentence that it was discussed.

Auditors pay particular attention to root cause analysis. Was only the symptom fixed, or was the problem prevented from recurring? Note briefly in the plan's description what the cause was and why the measure addresses it.

The activity log is also revealing for the auditor. It shows when a plan was created, changed and completed, and by whom. With the “External auditor” role they can see this themselves and add comments, but never delete anything. The log also records that the access comes from an external person.

Common mistakes

The most common mistake is the plan that stays open forever. It was created months ago, nobody feels responsible, and the deadline passed long ago. Such plans do more harm than good, because they show that gaps are known but not being addressed. Clean up regularly: implement, reschedule or close with a reason.

A second mistake is completing without proof. The status “completed” alone convinces no auditor. Link the evidence that the measure has been implemented, such as an amended policy, a screenshot of the new setting or the record of a training session.

Third, the link to the control is often missing. A plan that only sits in a list does not explain which requirement it fulfils. With the link to the control, the connection is still clear months later.

Fourth, technical findings and organisational gaps are managed separately. In Sightadel both come together in the same action plans. That way management sees in one place what is open.

Questions and answers

Questions about action plans

More in our FAQ or directly via our contact form.

Who can create action plans?

People with write permissions, such as Admin or Consultant. Readers and the external auditor see the plans but do not change them.

Can a plan cover several controls?

Yes. You link several controls, documents, vulnerabilities and requests to one plan.

Is the due date mandatory?

No, only title and owner are mandatory fields. We still recommend a deadline, otherwise the plan easily gets left behind.

Can the auditor view the activity log?

Yes. The “External auditor” role reads and comments, creates or edits only after your approval and never deletes. The log also records that the access comes from an external person.

What is the difference between correction and corrective action?

A correction fixes a specific nonconformity, such as expired evidence. Corrective action removes the cause so that the nonconformity does not recur, for example through fixed responsibility and a validity date. Both can be managed as an action plan.

Can I turn a vulnerability into an action plan?

Yes. For an issue from the Security Score you create an action plan and link it to the vulnerability and the matching control. The technical finding becomes a managed measure.

Who should be responsible for an action plan?

The person who can actually steer the implementation, usually the manager responsible for the area or the owner of the affected system. They do not have to do everything themselves, but they must make sure the measure is implemented on time.

Do action plans belong in the management review?

Yes. ISO 27001 and ISO 9001 expect management to consider the status of actions from previous reviews and how nonconformities have been handled. The list of plans with status and deadline is a good basis for this.

Start with one standard.

14 days, full access, no payment details. Everything you set up carries over into the paid plan.